Maktek Steel Solutions has been executing large-scale water infrastructure and pipeline projects for over seven years across India. The company has successfully installed more than 100+ kilometres of pipeline network ranging from 100 mm to 2000 mm diameter supporting urban and rural water transmission systems.
Our team includes certified 6G position welders and experiences pipe fitters, delivering quality-focused installation, testing, meter fixing, and associated engineering support for critical pipeline projects
Maktek executes installation of pipeline systems ranging from 100 mm to 2000 mm in diameter, covering materials such as MS, BWSC, HDPE, DI, CI, and GI. Our scope includes trench excavation, alignment, jointing and welding, lowering, backfilling, and commissioning support. The availability of certified 6G position welders and experienced pipe fitters ensures high-quality welding standards and long-term performance of critical water transmission infrastructure.
We have delivered water transmission and distribution projects for Metro Water authorities and TWAD Board, including dam-to-urban and rural water transfer systems. Our execution includes main transmission lines, distribution networks, and associated infrastructure works, ensuring reliable water supply across densely populated and remote areas.
Maktek has installed more than 3000+ House Service Connections (HSC), including service pipeline integration and meter fixing. These works are carried out with careful coordination to ensure accurate alignment, proper connection integrity, and seamless integration into existing distribution systems.
Quality assurance is maintained through structured testing procedures including UV testing, X-ray weld inspection, air pressure testing, and other relevant checks to ensure pipeline integrity, joint reliability, and compliance with project specifications.
In addition to pipeline installation, Maktek undertakes waterproofing works for sump tanks and dam-related water containment structures. These works are executed to ensure durability, leakage prevention, and long-term structural performance of water infrastructure facilities.
Our infrastructure operations are supported by dedicated plant and machinery including a 230-class heavy excavator with hydraulic breaker, Hitachi 40 mini excavator with breaker, JCB backhoe loader with breaker, 23-tonne crane, DG full set, and site logistics vehicles such as Mahindra pickup. The availability of owned machinery enhances project control, scheduling reliability, and execution efficiency.
Pipeline installation Execution
Welding and Jointing support
House Service Connections
Meter Fixing Coordination
Testing & QA Support
Commissioning Assistance
UT Testing
X-ray Weld Inspection
Air Pressure Testing
Pipeline Integrity Checks
Waterproofing for sump tanks and dam-related structures
230-class heavy excavator with breaker
Hitachi 40 mini excavator with breaker
JCB backhoe loader with breaker
23-tonne crane
DG full set
Mahindra pickup and site logistics vehicles